This is a summary of TEPCO Holdings, the power company with the largest share in the Japanese electricity market. We are going to detail TEPCO’s company profile, contact information, and its electricity and gas rate list.

TEPCO's electricity rate plan list

TEPCO offers plans for homes using only electricity (all-electricity plans) as well as standard electricity rate plans, such as the metered lamp plan. In addition, since the regulation on the utility services have been removed thanks to the liberalization of the energy market, they expanded their business to cover all across the nation (Hokkaido, Tohoku, Chubu, Hokuriku, Kansai, Chugoku, Shikoku, Kyushu).

Get a better deal!

hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
Apply now
(official site)
Get a better deal!
hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
(official site)
TEPCO's electricity rate plans
Metered lamp plan This is the most basic electricity rate plan. Within the TEPCO jurisdiction, a fixed monthly base fee will be charged according to the contracted amperage (or contracted capacity). In addition, electricity charges will be incurred according to the amount of electricity used (KwH).
All-electricity plan The electricity charge to be paid differs depending on the season and the amount of electricity use at what time of the day. This plan is suitable for homes that often use electricity at night and all-electric homes.
Electricity and gas set plan It is a plan that comes with a discount for using TEPCO's electricity and city gas as a bundle. TEPCO offers the "Tokutoku Gas Plan", a set plan for electricity and gas in the Tokyo Gas supply area.

The electricity rate offered by TEPCO differ according to the power supply area. Even if the plan name is the same, if the power supply area is different, the basic charge per ampere and the electricity charge per kWh will also be different. First, select the power area from the following options:

Get a better deal!

hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
Apply now
(official site)
Get a better deal!
hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
(official site)

 

Open the list of power supply areas Close the list of power supply areas

TEPCO・Kanto area rate plan

The Kanto area is mainly supplied by TEPCO. In the Kanto area, they offer a metered power plan, an all-electric plan, and a set plan with gas. The main rate plans by type are as follows.

TEPCO・Kanto area rate plan
Main electricity charges Overview
Metered Power Plan B・C
= Jyuryo dento Plan B・C
  1. It is the most subscribed to plan among the electricity rate plans. It has existed before the liberalization of the electricity retail market.
  2. Electricity fees are set depending on the amount of electricity used, regardless of the time of use.
  3. Metered power plan B has a maximum amperage of 60A. The metered power plan C has a contracted amperage of 6 kVA or more.
  4. The base fee depends on the contracted amperage.
Standard Plan S・L
  1. Electricity fees are set depending on the amount of electricity used, regardless of the time of use.
  2. Standard S has an amperage of up to 60A. Standard L has an amperage of 6 kVA or more.
  3. The base fee depends on the contracted amperage.
Premium Plan S・L
  1. The premium plan is for people who use a lot of electricity.
  2. The electricity fee is a fixed amount up to the first 400kWh, and when it exceeds 400kWh, the electricity charge is calculated per 1kWh.
  3. Premium plan S has an amperage of up to 60A. Premium plan L has an amperage of 6 kVA or more/a>

Are new power companies' plans cheap for a metered power plan (Jyuryo dento plan)? Most of the new power companies' plans tend to be cheaper than TEPCO.

Alternative Electricity Utilities
Name Features

Hinatao Energy

 Official Site
  • Beneficial price plans (cheaper than TEPCO)
  • Full-English support!
  • (Service available only in the Kanto region)

Tokyo Gas (Electricity)

Tokyo Gas  Official Site
  • Beneficial price plans (cheaper than TEPCO)
  • (Service available only in the Kanto region)

Octopus Energy

オクトパスエナジー  Official Site
  • Areas : All over Japan except Okinawa region
  • 100% Renewable energy plans available

DoCoMo Denki

ドコモでんき  Official Site
  • Earn d POINTs accumulating by payment of your electricity bill
  • Areas : All over Japan except Okinawa region

TEPCO metered power plan B・C fees

TEPCO's metered power plan (= Jyuryo dento Plan) has base fees. Metered power plan B is an electricity rate plan for general households, stores, and business establishments with a contract amperage of up to 60A.

Metered plan C (= Jyuryo dento Plan C) is a plan for stores / businesses, establishments, and large houses that use more electricity with a contract amperage of 6 kVA or more.

TEPCO metered power plan B:base fee
Contracted amperage Base fee
10A ¥311.75
15A ¥467.63
20A ¥623.50
30A ¥935.25
40A ¥1247.00
50A ¥1558.75
60A ¥1870.50

TEPCO metered power plan B's basic fees are separated into 7 categories according to the contracted amperage.

The number of amperes required depends on the size of the room and the number of electrical appliances used. If you use a large amount of electrical appliances at once and exceed the contracted amperage capacity, the breaker will shut down the electricity, causing a temporary power outage.

That is why, a pay-as-you-go metered power plan requires an ampere contract with a margin. With TEPCO's metered power plan, the higher the amperage contracted, the higher the monthly base fee. If you want to reduce the monthly base fee, we recommend a rate plan without base fees.

TEPCO metered power plan B:electricity charges
Power consumption(kWh) Price per kWh
0 - 120 kWh ¥29.80
120 - 300 kWh ¥36.40
300 kWh or more ¥40.49

The fees of TEPCO metered power plan B (Jyuryo dento B) are separated according to three levels of electricity use.

As the amount of KwH used increases, the price per 1kWh increases. The charge per 1kWh differs by 10 yen or more for a power consumption between 120kWh and 300kWh or more. In other words, the charge per 100kWh from 0kWh to 100kWh and from 300kWh to 400kWh will have a ¥1000 difference .

Among the new electricity providers, there are plans with a uniform electricity rate per 1kWh. For example, with Looop Denki's House Plan, since the power consumption fees are not subject to usage thresholds, it will be cheaper than TEPCO's metered power plan.

TEPCO metered power plan C's fees

TEPCO's metered power plan C's contract has an amperage capacity of 6 kVA or more. This is a rate plan used in stores and business establishments that use a large amount of electricity. The basic charge is set per 1kVA of contract capacity, so the larger the contract capacity, the higher the monthly basic charge.

TEPCO metered power plan C:base fees
Base fees(per 1kVA) ¥311.75
TEPCO metered power plan C:electricity charge
Power consumption(kWh) Price per 1kWh
0 - 120kWh ¥29.80
120 - 300kWh ¥36.40
300kWh or more ¥40.49

TEPCO standard plans, S / L, fees:Kanto area

TEPCO's Standard plans, S / L, have exactly the same charge system as the metered power plans, B / C, and the charges are almost identical. Standard plan S is an electricity rate plan for general households, stores, and business establishments with an amperage of up to 60A. Standard plan L is a plan for stores / business establishments and large houses that use more electricity at one time with an amperage of 6 kVA or more.

TEPCO standard plan S(fees Kanto area)

See the tariff standard plan S

TEPCO standard plan S:Base fees(Kanto area)
amperage Base fee
10A ¥311.75
15A ¥467.63
20A ¥623.50
30A ¥935.25
40A ¥1247.00
50A ¥1558.75
60A ¥1870.50
TEPCO standard plan S:Electricity consumption fees(Kanto area)
Electricity consumption(kWh) Price per 1kWh
0 - 120kWh ¥29.80
120 - 300kWh ¥36.40
300kWh or more ¥40.49

TEPCO's Standard S Plan is a plan equivalent to the conventional metered power plan B with a few changes. The metered power plan B has regulated rate plan, while the standard S plan has a free rate plan.

After the liberalization of the electricity market, major electric power companies have announced a new free charge plan in addition to the previous regulated charge plans. Some people who used to use the metered power plan B may have received information via pamphlets or booklets from TEPCO and changed to this standard S plan.

As you can see by comparing the price list, the price of metered power plan B and standard S is almost the same. Only the electricity charges of 120kWh or more and less than 300kWh are different.

Switching from the metered power plan B to the standard S plan will not be cheaper. If you are currently using the TEPCO Standard S plan and want to reduce your electricity bill as much as possible, we recommend "Yokaene", which reduces your electricity bill (base fees + electricity consumption charges) by 10%.

TEPCO standard plan L(fees Kanto area)

See the tariff standard plan L

Standard plan L

TEPCO standard plan L:Base fees(Kanto area)
Base fees: per 1KvA ¥311.75

All prices include tax

TEPCO standard plan L:Electricity consumption fees(Kanto area)
Electricity consumption(kWh) Price per 1kWh
0 - 120kWh ¥29.80
120 - 300kWh ¥36.40
300kWh or more ¥40.49

※All prices include taxes

Get a better deal!

hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
Apply now
(official site)
Get a better deal!
hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
(official site)

TEPCO: Night Plan (Kanto area)

TEPCO's Night Toku Plan is a plan with a low electricity fees during the night . It is a plan for all-electric homes and homes that use a lot of electricity at night, such as running a rice cooker and dishwasher with a timer at night.

  • The contract power that is the basis for determining the basic charge is determined by the largest value of the power consumption every 30 minutes, Smart contract .
  • For Night Plan 8, the price from 11:00 pm to 7:00 am is set to be cheap, and for Night Plan 12, the price from 9:00 pm to 9:00 am is set to be cheap.
  • Night Plan 8 compared to Night Plan 12 spans for a shorter period of time, but it is the cheapest of both options.

Tariff table

Night plan 8

TEPCO: Night Plan 8: Basic charge (Kanto area)
Base fees(Contracted price per 1kW) ¥255.69
TEPCO: Night Plan 8: Electricity consumption fees (Kanto area)
Day time(7:00 am to 11:00 pm) Night time(11:00 pm to 7:00 am the next day)
¥42.60(per 1kWh) ¥31.64(per 1kWh)

※All prices include tax

Night plan 12

TEPCO: Night Plan 12: Basic charge (Kanto area)
Base fees(Contracted price per 1kW) ¥255.69
TEPCO: Night Plan 12: Electricity consumption fees (Kanto area)
Day time(9:00 am to 9:00 pm) Night time(9:00 pm to 9:00 am the next day)
¥44.16(Per 1kWh) ¥33.33(Per 1kWh)

※All prices include tax.

TEPCO: Smart Life (Kanto area)

  • Smart Life S is an electricity rate plan for general households, stores, and business establishments with a contract amperage of up to 60A. Smart Life L is a plan for stores / business establishments and large-scale homes that use a great amount of electricity at one time with a contract amperage of 6 kVA or more.
  • The electricity charge during the night time (1 am to 6 am) will be cheaper.
  • The smart life plan is a plan in which the contracted power, which is the basic charge, is determined by the amount of power used in the past 11 months.

Tariff table

Smart Life S

TEPCO: Smart Life S: Base fees (Kanto area)
Contrated amperes Base fees
10A ¥311.75
15A ¥467.63
20A ¥623.50
30A ¥935.25
40A ¥1247.00
50A ¥1558.75
60A ¥1870.50

※All prices include tax.

TEPCO: Smart Life S: Electricity consumption fees (Kanto area)
During day time
(6:00 am to 1:00 am the next day)
During night time
(1:00 am to 6:00 am)
¥35.76(Per 1kWh) ¥27.86(Per 1kWh)

※All prices include tax.

Get a better deal!

hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
Apply now
(official site)
Get a better deal!
hinatao energy
Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
(official site)

Smart Life L

TEPCO: Smart Life L: Base fees (Kanto area)
Base fees (per contracted 1kW) ¥311.75

※All prices include tax.

TEPCO: Smart Life L: Electricity consumption fees (Kanto area)
During day time
(6:00 am to 1:00 am the next day)
During night time
(1:00 am to 6:00 am)
¥35.76(Per 1kWh) ¥27.86(Per 1kWh)

※All prices include tax.

Smart Life Plan

TEPCO: Smart Life Plan: Base fees (Kanto area)
  ¥501.03

※All pries include tax.

TEPCO: Smart Life Plan: Electricity Consumption fees (Kanto area)
During day time
(6:00 am to 1:00 am the next day)
During night time
(1:00 am to 6:00 am)
¥35.76(per 1kWh) ¥27.86(per 1kWh)

※All prices include tax.

TEPCO: Aqua Energy 100 (Kanto area)

Aqua Energy 100 is based on real hydropower energy with zero CO2 emissions. It is a plan that was created after the liberalization of the electricity market.

Tariff table

Aqua Energy 100

contracted amperes Base fees(¥/Per month)
10A ¥586.75
15A ¥880.13
20A ¥1173.50
30A ¥1760.25
40A ¥2347.00
50A ¥2933.75
60A ¥3520.50
Electricity consumption Electricity consumption fees(¥/kWh)
The first 300kWh ¥23.66
More than 300kWh ¥30.40

※All prices include tax

TEPCO / Chubu area electricity rate plans

The electricity rate plans provided by TEPCO for general households in the Chubu area are as follows. Please click the plan name to check the price list.

Electricity rate plan in the Chubu area
Standard
  • A standard plan for general households equivalent to Chubu Electric Power's metered rate B and C.
  • The electricity consumption fees according to the electricity consumption is set in three categories based on energy usage
Premium
  • A plan for households that use a lot of electricity, which was born after the liberalization of electricity.
  • The electricity charge according to the electricity usage is a fixed amount up to 400kWh.
  • Recommended for households with an average monthly electricity bill of 16,000 yen or more.

TEPCO: Standard (Chubu area)

  • This plan is equivalent to Chubu Electricity Company's metered rate B / C .
  • Standard S has a lower electricity fee than Chubu Electricity Company.
  • Standard S is for those with a contract capacity of 10 to 60A.
  • Standard L is for those with a contract capacity of 60A (6kVA) or more.
  • Standard X is smart plan . The base fee is based on peak consumption.

    Tariff table

    Standard S

     
    TEPCO: Standard Plan S (Chubu Area) Tariff table
    Base fees
    Contracted amperes Chubu Electricity Company
    Metered rate plan B
    Chubu Electricity Company
    TEPCO
    Standard plan S
    TEPCO
    10A ¥321.14 ¥297.01
    15A ¥481.71 ¥445.51
    20A ¥642.28 ¥594.02
    30A ¥963.42 ¥891.03
    40A ¥1284.56 ¥1188.04
    50A ¥1605.70 ¥1485.05
    60A ¥1926.84 ¥1782.06
    Electricity consumption fees(Per 1kWh)
      Chubu Electricity Company
    Metered rate plan B
    TEPCO
    Standard plan S
    Up to 120kWh ¥21.20 ¥30.66
    120kWh-300kWh ¥25.67 ¥37.23
    More than 300kWh ¥28.62 ¥41.33

    ※All prices include tax.

    Standard L

     
    TEPCO: Standard Plan L (Chubu Area) Tariffs table
    Base fees
    Contracted amperes Chubu Electricity Company
    Metered rate planC
    Chubu Electricity Company
    TEPCO
    Standard plan L
    TEPCO
    Per 1kVA ¥321.14 ¥297.01
    Electricity consumption fees(per 1kWh)
      Chubu Electricity Company
    Metered rate plan C
    TEPCO
    Standard plan L
    Up to 120kWh ¥21.20 ¥30.66
    120kWh-300kWh ¥25.67 ¥37.23
    More than 300kWh ¥28.62 ¥41.33

    ※All prices include tax

    Standard X

    • The contracted consumption rate is the basis for determining the base fees and it is calculated according to the highest electricity consumption rate every 30 minutes, Smart contract .
    • Electricity consumption fees (unit price per 1kWh ) have two energy usage thresholds.
    • 1kWh does not change depending on the season or time of day.
    TEPCO: Standard X: Base fees (Chubu area)
    Base fees(Per contracted 1kW) ¥604.50
    TEPCO: Standard X: Electricity consumption fees (Chubu area)
    Electricity consumption(kWh) Price per 1kWh
    0 - 120kWh ¥30.66
    120 - 300kWh ¥37.23
    More than 300kWh ¥41.33

    ※All prices include tax.

    TEPCO: Premium (Chubu area)

    The premium plan is a flat-rate electricity rate plan for households that use a lot of electricity. The monthly electricity consumption fee is a fixed amount up to 400kWh. It is recommended for households with an average monthly electricity bill of 16,000 yen or more due to the large number of electrical appliances and/or pets.

    • Premium S has a contract capacity of 10 to 60A.
    • Premium L has a contract capacity of 60A (6kVA) or more.
    • Premium plan is smart contract . The base fee is based on peak electricity consumption.

    Tariff table

    Premium S

    TEPCO: Premium S: Base fees (Chubu area)
    Contracted amperes Base fees
    10A ¥297.01
    15A ¥445.51
    20A ¥594.02
    30A ¥891.03
    40A ¥1188.04
    50A ¥1485.05
    60A ¥1782.06

    ※All prices include tax.

    Premium S

    TEPCO: Premium S: Electricity consumption fees (Chubu area)
    Flat rate(¥/Per month) Electricity consumption fees(¥/kWh)
    Up to 400kWh More than 400kWh
    ¥14184.99(Flat rate) ¥40.34

    ※All prices include tax.

    Premium L

    TEPCO: Premium L: Base fees (Chubu area)
    Base fees(Per 1kVA) ¥297.01

    ※All prices included.

    TEPCO: Premium L: Electricity consumption fees (Chubu area)
    flat rate fees(¥/Month) Electricity consumption fees(¥/kWh)
    Up to 400kWh More than 400kWh
    ¥14184.99(flat rate) ¥40.34

    ※All prices include tax.

    Premium plan

    TEPCO: Premium plan: Base fees (Chubu area)
    Base fees(Per contracted 1kW) ¥504.33

    ※All prices include tax.

    TEPCO: Premium plan: Electricity consumption fees (Chubu area)
    Flat rate(¥/month) Consumption(¥/kWh)
    Up to 400kWh More than 400kWh
    ¥14184.99(flat rate) ¥40.34(per 1kWh)

    ※All prices include tax.


    TEPCO / Kansai area electricity price list

    The electricity rate plans provided by TEPCO for general households in the Kansai area are as follows. Please click the plan name to check the price list.

    Electricity rate plan in the Kansai area
    Standard
    • A standard plan for general households equivalent to Kansai Electricity Company's metered rate plan A
    • The amount of electricity consumption fees is divided by 3 energy usage levels (Standard A).
    Premium
    • A plan for households that use a lot of electricity, which was created after the liberalization of the electricity market.
    • The electricity consumption fees are fixed up to 400kWh
    • Recommended for households with an average monthly electricity bill of 16,000 yen or more

    TEPCO: Standard (Kansai area)

    Tariff table

    Standard A

    TEPCO: Standard A (Kansai area) tariffs table
    Minimum fees
      KEPCO
    Metered rate plan A
    KEPCO
    TEPCO
    Standard plan A
    TEPCO
    Up to 15kWh(Monthly fixed cost) ¥522.58 ¥1393.18
    Lectricity consumption fees(price per 1kWh)
      KEPCO
    Metered rate plan A
    TEPCO
    Standard A
    15kWh-120kWh ¥20.21 ¥30.61
    120kWh-300kWh ¥25.61 ¥37.28
    More than 300kWh ¥28.59 ¥41.40

    All prices include tax

    Standard X

    • The contracted consumption rate is the basis for determining the base fees, and it is calculated according to the highest electricity consumption rate every 30 minutes, Smart contract
    • Electricity consumption fees (per 1kWh) have two levels of electricity use.
    • Price per 1kWh does not change according to the season or time of day.
    TEPCO: Standard X: Base fees (Kansai area)
    Base fees(per contracted 1kW) ¥470.69

    ※All prices include tax.

    TEPCO: Standard X: Electricity consumption fees (Kansai area)
    Electricity consumption(kWh) Price per 1kWh
    Up to 400kWh ¥34.60
    More than 400kWh ¥41.40

    ※All prices include tax.

    TEPCO: Premium (Kansai area)

    • The contracted consumption level is the basis for determining the base fees, and it is is calculated according to the largest highest of electricity consumption every 30 minutes.
    • The electricity consumption fee is a fixed amount up to 400kWh of monthly consumption. If it exceeds 400kWh, the charge will be set according to the consumption amount.
    • In the case that a household is using more than 400kWh, then this plan is slightly more advantageous than metered rate plan B / C .
    • The price per 1kWh does not change according to the season or time of day.

    Tariff table

    Premium plan

    TEPCO: Premium plan: Base fees (Kansai area)
    Base fees(per contracted 1kW) ¥369.66

    ※All prices include tax.

    TEPCO: Premium plan: Electricity consumption fees (Kansai area)
    flat rate electricity consumption fees
    Up to 400kWh More than 400kWh
    ¥14191.97(flat rate) ¥40.41(per 1kWh)

    ※All prices include tax.


    TEPCO / Hokkaido area electricity rate plans

    These are the features and price lists of the electricity rate plans provided by TEPCO for general households in the Hokkaido area.

    TEPCO: Standard (Hokkaido area)

    The Standard plan is the equivalent to the metered lamps B and C of HEPCO (Hokkaido Electric Power Company). They are offered according to the contracted capacity. The plan's electric energy charges are cheaper than Hokkaido Electric Power.

    • Standard S is for households with an ampere capacity of 10 to 60A.
    • Standard L is for households with an ampere capacity of 60A (6kVA) or more.

    Tariff table

    Standard S

     
    TEPCO: Standard S (Hokkaido area) rate list
    Base fees
    Contracted amperes HEPCO
    Metered rate plan B
    HEPCO
    TEPCO
    Standard S
    TEPCO
    10A ¥402.60 ¥378.41
    15A ¥603.90 ¥567.62
    20A ¥805.20 ¥756.82
    30A ¥1207.80 ¥1135.23
    40A ¥1610.40 ¥1513.64
    50A ¥2013.00 ¥1892.05
    60A ¥2415.60 ¥2270.46
    Electricity consumption fees(Per 1kWh)
      HEPCO
    Metered rate plan B
    TEPCO
    Standard S
    Up to 120kWh ¥35.35 ¥30.88
    120kWh-280kWh ¥41.64 ¥37.52
    More than 280kWh ¥45.36 ¥41.64

    ※All prices include tax.

    Standard L

     
    TEPCO:Standard L(Hokkaido area)tariff table
    Base fees
    Contracted amperes HEPCO
    Metered rate plan C
    HEPCO
    TEPCO
    Standard L
    TEPCO
    Per 1kVA ¥402.60 ¥378.41
    Electricity consumption fees(per 1kWh)
      HEPCO
    Metered rate plan C
    TEPCO
    Standard L
    Up to 120kWh ¥35.35 ¥30.88
    120kWh-280kWh ¥41.64 ¥37.52
    More than 280kWh ¥45.36 ¥41.64

    ※All prices include tax.

    Features and tariff list of electricity rate plans provided by TEPCO for general households in the Tohoku area.

    TEPCO: Standard (Tohoku area)

    TEPCO's Standard plan is the equivalent of Tohoku electricity company's metered rate plan B/C. They are offered according to the ampere capacity. The plan's electricity consumption charges are cheaper than Tohoku Electricity Company.

    • Standard S is for households with an ampere capacity of 10 to 60A.
    • Standard L is for households with an ampere capacity of 60A (6kVA) or more.

    Tariff table

    Standard S

     
    TEPCO: Standard Plan S (Tohoku area) tariff list
    Base fees
    Contracted amperes Tohoku Electricity Company
    Metered rate plan B
    tohokuden
    TEPCO
    Standard plan S
    TEPCO
    10A ¥369.60 ¥327.81
    15A ¥554.40 ¥491.71
    20A ¥739.20 ¥655.62
    30A ¥1108.80 ¥983.43
    40A ¥1478.40 ¥1311.24
    50A ¥1848.00 ¥1639.05
    60A 2217.60 1966.86
    Electricity consumption fees(per 1kWh)
      Tohoku electricity company
    Metered rate plan B
    TEPCO
    Standard plan S
    Up to 120kWh ¥29.62 ¥31.88
    120kWh-300kWh ¥36.37 ¥38.56
    More than 300kWh ¥40.32 ¥42.72

    ※All prices include tax.

    Standard L

     
    TEPCO: Standard Plan L (Tohoku area) tariff list
    Base fees
    Contracted amperes Tohoku Electricity Company
    Metered rate plan C
    tohokuden
    TEPCO
    Standard plan L
    TEPCO
    Per 1kVA ¥369.60 ¥327.81
    Electricity consumption fees(per 1kWh)
      Tohoku electricity company
    Metered rate plan C
    TEPCO
    Standard plan L
    Up to 120kWh ¥29.62 ¥31.88
    120kWh-300kWh ¥36.37 ¥38.56
    More than 300kWh ¥40.32 ¥42.72

    ※All prices include tax.

    What is the best power company in the Tohoku area? In the Tohoku area, in addition to TEPCO, you can choose a new electricity rate plan or change from a plan you have already subscribed to.


    TEPCO / Hokuriku area electricity plan rates

    Features and price list of electricity rate plans provided by TEPCO for general households in the Hokuriku area.

    TEPCO: Standard (Hokuriku area)

    TEPCO's Standard plan is the equivalent to Hokuriku Electricity Company metered rate plans B and C. Standard S and Standard L are offered according to the contracted amperes. The plan's electricity consumption charges are cheaper than Hokuriku Electricity Company.

    • Standard S is for households with a contracted capacity of 10 to 60A.
    • Standard L is for households with a contracted capacity of 60A (6kVA) or more.

    Tariff table

    Standard S

    TEPCO: Standard S (Hokuriku area) tariff table
    Base fees
    Contracted amperes Hokuriku Electricity Company
    Metered rate plan B
    Hokuriku Electricity Company
    TEPCO
    Standard S
    TEPCO
    10A ¥302.50 ¥353.11
    15A ¥453.75 ¥529.66
    20A ¥605.00 ¥706.22
    30A ¥907.50 ¥1059.33
    40A ¥1210.00 ¥1412.44
    50A ¥1512.50 ¥1765.55
    60A ¥1815.00 ¥2118.66
    Electricity consumption area(per 1kWh)
      Hokuriku Electricity Company
    Metered rate plan B
    TEPCO
    Standard S
    Up to 120kWh ¥30.86 ¥29.95
    120kWh-300kWh ¥34.75 ¥36.63
    More than 300kWh ¥36.46 ¥40.76

    ※All prices include tax.

    Standard L

    TEPCO: Standard L (Hokuriku area) tariff list
    Base fees
    Contracted amperes Hokuriku Electricity Company
    Metered rate plan C
    Hokuriku Electricity Company
    TEPCO
    Standard L
    TEPCO
    Per 1kVA ¥302.50 ¥353.11
    Electricity consumption charges(per 1kWh)
      Hokuriku Electricity Company
    Metered rate plan C
    TEPCO
    Standard L
    Up 120kWh ¥30.86 ¥29.95
    120kWh-300kWh ¥34.75 ¥36.63
    More than 300kWh ¥36.46 ¥40.76

    ※All prices include tax.

    TEPCO / Chugoku area electricity rate plans"

    It includes features and rate plans provided by TEPCO for general households in the Chugoku area.

    TEPCO: Standard (Chugoku area)

    TEPCO's Standard plan is similar to Chugoku Electricity Company's metered rate plan A. The Standard plan's electricity consumption charges after 120kWh are cheaper than Chugoku Electricity Company.

    • Standard A is for households with a contracted capacity of less than 6 kVA.

    Tariff list

    Standard A

    TEPCO: Standard A (Chugoku area) tariff list
    Minimum fees
      Chugoku Electricity Company
    Metered rate plan A
    Chugoku Electricity Company
    TEPCO
    Standard A
    TEPCO
    Up to15kWh(Monthly fixed cost) ¥759.68 ¥1449.59
    Electricity consumption fees(per 1kWh)
      Chugoku Electricity Company
    Metered rate plan A
    TEPCO
    Standard A
    15kWh-120kWh ¥32.75 ¥32.00
    120kWh-300kWh 39.43 38.66
    More than 300kWh ¥41.55 ¥42.79

    ※All prices include tax.


    TEPCO / Shikoku area electricity rates list"

    The following are the features and price lists of electricity rate plans provided by TEPCO for general households in the Shikoku area.

    TEPCO: Standard (Shikoku area)

    TEPCO's Standard plan is the equivalent to the metered rate plan A of Shikoku Electricity Company . The plan's base fees and electricity consumption fees are cheaper than Shikoku Electricity Company.

    • Standard A is for households with a contracted capacity of less than 6 kVA.

    Tariff table

    Standard A

    TEPCO: Standard A (Shikoku area) tariff list
    Minimum charge
      Shikoku Electricity Company
    Metered rate plan A
    Shikoku Electricity Company
    TEPCO
    Standard A
    TEPCO
    Up to 11kWh(Monthly fixed cost) ¥666.89 ¥1362.26
    Electricity consumption fees(per 1kWh)
      Shikoku Electricity Company
    Metered rate plan A
    TEPCO
    スタンダードA
    11kWh-120kWh ¥30.65 ¥32.04
    120kWh-300kWh ¥37.27 ¥38.74
    More than 300kWh ¥40.78 ¥42.90

    ※All prices include tax.

    The following are the features and price lists of the electricity rates provided by TEPCO for general households in the Kyushu area.

    TEPCO: Standard (Kyushu area)

    TEPCO's Standard plan is the equivalent to the metered rate plans B and C of Kyushu Electricity company. Standard S and Standard L are offered according to the contracted capacity. The plan's electricity consumption fees are cheaper than Kyushu Electricity Company.

    • Standard S is for households with a contract capacity of 10 to 60A.
    • Standard L is for households with a contract capacity of 60A (6kVA) or more.

    Tariff table

    Standard S

    TEPCO: Standard Plan S (Kyushu area) price list
    Base fees
    Contracted amperes Kyushu Electricity Company
    Metered rate plan B
    Kyushu Electricity Company
    TEPCO
    Standard plan S
    TEPCO
    10A ¥316.24 ¥323.41
    15A ¥474.36 ¥485.12
    20A ¥632.48 ¥646.82
    30A ¥948.72 ¥970.23
    40A ¥1264.96 ¥1293.64
    50A ¥1581.20 ¥1617.05
    60A ¥1897.44 ¥1940.46
    Electricity consumption fees(per 1kWh)
      Kyushu Electricity Company
    Metered rate plan B
    TEPCO
    Standard plan S
    Up to 120kWh ¥18.37円 ¥30.90円
    120kWh-300kWh ¥23.97 ¥37.59
    More than 300kWh ¥26.97 ¥41.74

    ※All prices include tax.

    Standard L

     
    TEPCO: Standard Plan L (Kyushu area) tariff list
    Base fees
    Contracted amperes Kyushu Electricity Company
    Metered rate plan C
    Kyushu Electricity Company
    TEPCO
    Standard plan L
    TEPCO
    Per 1kVA ¥316.24 ¥323.41
    Electricity consumption fees(per 1kWh)
      Kyushu Electricity Company
    Metered rate plan C
    TEPCO
    Standard L
    Up to 120kWh ¥18.37 ¥30.90
    120kWh-300kWh ¥23.97 ¥37.59
    More than 300kWh ¥26.97 ¥41.74

    ※All prices include tax.


    What is TEPCO's smart contract?

    What is TEPCO's smart contract?
    The "smart contract" is made possible with a new electricity meter called a smart meter, which shows the customer's electricity usage every 30 minutes.

    A smart contract means that the base fee is not fixed, but changes every year depending on the value measured by the smart meter. The base fee is determined by the contracted power measured by the smart meter.

    In the smart contract, the highest volume of electricity consumption (maximum power consumption level within every 30 minutes) of each month of the past year (the current month and the previous 11 months) measured by the smart meter is the contracted power. In other words, the key to reducing charges for consumers is to reduce the maximum power during peak hours of energy usage.

    If you use a considerable amount of electricity on a daily basis, you can reduce the base fee by reducing your maximum intake.

    TEPCO Gas: Toku Toku Gas Plan

    TEPCO sells the city gas plan, "Tokutoku Gas Plan". It is a plan that is available for customers in the city gas supply area of Tokyo Gas.

    The features of the Toku Toku Gas Plan are as follows:

    • Gas charges are 3% cheaper than Tokyo Gas's standard plan "general charges."
    • "New customer discount" for 1 year from the contract, 5% cheaper (normal 3% discount + 5% new customer discount, 8% discount for the first year)

    Tariff list

    Toku Toku gas plan
    TEPCO Toku Toku gas plan tariff list(tax incl.)
    Base fees(¥/month) TEPCO
    Toku Toku gas plan
    Tokyo Gas
    General fees(Tokyo area, etc.)
    0m³-20m³ ¥736.23 ¥759.00
    20m³-80m³ ¥1024.32 ¥1056.00
    80m³-200m³ ¥1195.04 ¥1232.00
    200m³-500m³ ¥1835.24 ¥1892.00
    500m³-800m³ ¥6103.24 ¥6292.00
    More than 800m³ ¥12078.44 ¥12452.00
    Metered rate plan(¥/m³) TEPCO
    Toku Toku gas plan
    Tokyo Gas
    General fees
    0m³-20m³ ¥140.94 ¥145.31
    20m³-80m³ ¥126.54 ¥130.46
    80m³-200m³ ¥124.40 ¥128.26
    200m³-500m³ ¥121.20 ¥124.96
    500m³-800m³ ¥112.67 ¥116.16
    More than 800m³ ¥105.20 ¥108.46

    Furthermore, by subscribing to the following electricity rate plans of TEPCO, the "Gas Electricity Bundle Discount" will be applied, and the electricity bill will be reduced by 1,200 yen per year.

    How to check TEPCO's electricity rate plan and usage

    If you do not know the TEPCO rate plan or monthly usage you are currently using, use the meter reading table or TEPCO's Internet site: Living TEPC web

    When checking with the meter reading table: TEPCO

    If you are using TEPCO and are set to receive a monthly paper meter reading table, you can check the rate plan and usage amount currently in use with the meter reading table like the image. (Source: TEPCO Energy Partner HP)

    alt

    On the TEPCO member site Living TEPC web , you can check monthly electricity charges and electricity usage for the past two years online. can. To use Living TEPCO web, you need to register as a member.

    How to apply to TEPCO

    To apply for TEPCO's electricity rate plan and gas rate plan, follow the procedure on the website or by phone.

    If you live in your current residence and want to switch your electricity / gas provider to TEPCO, you will need to supply the "Customer number" and the "Supply point identification number" of your currently contracted electric power company / gas company. You can check this information from the meter reading slip that you receive every month, or from the customer's web page of the electric power company or gas company, so be prepared in advance.

    Apply on the website

    From the TEPCO Energy Partner website, proceed to the "Various procedures / inquiries" page. There are options such as "electricity procedure" and "gas procedure", so choose the procedure that suits your needs.

    Apply by phone

    The contact information for new applications for TEPCO's electricity rate plan and gas rate plan are as follows.

    Contact information to apply for a new TEPCO electricity rate plan / gas rate plan
    phone number 0120-995-333
    Reception hours Weekdays 9 am-8pm / Saturdays, Sundays, holidays, public holidays 9 am-5pm

    TEPCO Inquiry Desk

    東京電力番号
    The telephone number of the TEPCO customer center differs depending on the region.

    TEPCO accepts rate plan applications and various inquiries at the TEPCO Customer Center .

    Phone numbers vary depending on the region and requirements, so check the list of TEPCO Customer Center Phone Numbers and then check below. They will be in contact with you during their reception hours.

    Please be advised in advance that inquiries over the weekend or holidays will receive a phone call back after the weekend or in the morning after the holidays.

    TEPCO Customer Center reception hours (common) Monday-Saturday (excluding holidays) 9: 00-17: 00

    You can apply for TEPCO's electricity and gas set plan by phone (Selectra's Raku-Raku center).

    Get a better deal!

    hinatao energy
    Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
    Apply now
    (official site)
    Get a better deal!
    hinatao energy
    Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
    (official site)

    When contacting TEPCO online

    At TEPCO, you can apply for various procedures from the Internet. The procedure page differs depending on the procedure content. The list is summarized below.

    Perform online procedures with TEPCO (start / stop use / change plan)
    Procedure details / requirements Procedure page URL
    Electricity and gas moving procedure Procedure page
    Switch from other companies to TEPCO's electricity Procedure page
    Switch from another company to TEPCO's electricity / gas set plan Procedure page
    Change your current electricity rate plan Procedure page
    Switch from TEPCO to new provider Procedure page
    (Easy window of Selectra)

    Please check the links below for various payment procedures of TEPCO.

    TEPCO online procedure (payment procedure)
    Payment method Procedure page link
    Credit card payment procedure Procedure page
    Payment procedure with SMS selective payment Procedure page
    Payment procedure using transfer form (invoice) Procedure page

    What is TEPCO's SMS selective payment? SMS is a show message service that can be used on smartphones. If you select SMS Selective Payment, you will receive the monthly usage amount and the URL of the payment page via SMS. By clicking the URL, you can select the payment method and proceed to payment. The payment method is PAYSLE, which allows you to pay at convenience stores on your smartphone, or pay using a credit card.

    If you want to check the contents of the rate plan currently used by TEPCO and the monthly amount:

    The page where you can check the rate plan you are using at TEPCO differs depending on whether it is a regulated rate such as a metered light plan or a free rate such as a standard plan.

    Perform online procedures with TEPCO (inquiry about usage amount and plan details)
    Price plan Procedure page link
    If you are using a conventional rate plan such as a metered lamp

    Web meter reading table Procedure page
    The following information is required to use TEPCO's Web meter reading table.

    • Office code
    • 13-digit customer number
    • Where to use
    • Contract name
    • phone number
    If you are using a free rate plan (standard plan, premium plan, night discount plan, smart life plan, etc.)

    Living TEPCO web Procedure page
    Membership registration is required to use Living TEPCO web.

    If the payment deadline to TEPCO has passed or if TEPCO's electricity has been turned off

    If you do not pay the electricity bill after the deadline for paying the electricity bill to TEPCO, the electricity may be turned off. In that case, you will be able to use electricity again by promptly paying the fee for the overdue period and applying for the resumption of power transmission.

    Procedures for resuming power transmission and payment after the deadline Procedure page

    Get a better deal!

    hinatao energy
    Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's.
    Apply now
    (official site)
    Get a better deal!
    hinatao energy
    Get your electricity and gas in the Kanto area with the only service with full English support, and enjoy better prices than TEPCO's. Apply now
    (official site)

    About TEPCO Group

    Tokyo Electric Power Company (TEPCO) is a corporate group led by Tokyo Electric Power Company Holdings, Incorporated (English notation: Tokyo Electricity Company Holdings, Incorporated).

    TEPCO's Specialization of Business

    Until the full liberalization of electricity retailing in 2016, one TEPCO company exclusively generated, transmitted, distributed, and retailed electricity. However, due to the government-led separation policy of the retail business, power generation business, and power transmission and distribution business together with the liberalization of electric power, TEPCO split its company to specialize in each business and establish a subsidiary with an independent profit system to transfer the business. The subsidiaries split from TEPCO are as follows.

    Company name Business content Features
    TEPCO Energy Partner
    (TEPCO EP)

    Retail Business

    We retail electricity and gas in the Kanto area nationwide. This company is the contractor of electricity and gas contracts. It was established in April 2015 as a wholly owned subsidiary of the Toden Group, ahead of the complete liberalization of electricity retailing in April 2016. In May 2017, retail sales of gas began in the Tokyo Gas area. As an electricity retailer, it has the largest supply of electricity in Japan.
    TEPCO Power Grid
    (TEPCO PG)

    Power transmission and distribution business

    A company that manages and operates power transmission and distribution equipment such as utility poles and electric wires in the Kanto area. All electricity retailers (new electricity) that sell electricity in the Kanto area are using the power transmission and distribution equipment of this company. If there is a power outage in the Kanto area or there is a problem with electrical equipment such as utility poles or electric wires, contact this TEPCO Power Grid instead of the electric retail company (TEPCO EP or Shindenki).
    TEPCO Fuel & Power
    (TEPCO FP)

    Fuel / thermal power generation business

    A power generation company that was established in April 2016 by taking over only TEPCO's fuel and thermal power generation business. In April 2019, all thermal power plants of TEPCO FP and Chubu Electric Power were transferred to the joint venture "JERA". It is JERA that is actually engaged in the power generation business. TEPCO FP holds a 50% stake in JERA, and JERA is Japan's largest thermal power generation company. Since it is a thermal power generation company, it does not own a nuclear power plant.

    TEPCO's power generation business

    The operating company of TEPCO's power generation business differs depending on the power generation method. Thermal power generation is managed by JERA, a joint venture between Chubu Electric Power and TEPCO FP. The nuclear power plant is managed and operated by TEPCO Holdings.

    History of Electric Power Business

    After the end of the Pacific War, TEPCO promulgated an electric power business reorganization order and a public utility order in Japan by the Potsdam Order issued by the Supreme Commander for the Allied Powers (GHQ) on November 24, 1950. In response to this, it was founded on May 1, 1951 in the form of taking over the power supply to the Kanto region, which was under the jurisdiction of Kanto Distribution at that time.

    The capital of TEPCO at the time of its establishment was 1,460 million yen, which became the prototype of the current 10 electric power systems in Japan.

    As of 2015, TEPCO is Japan's largest electric power company with a Japanese electricity market share of 30% or more.

    Before the real nationalization that took place after the Fukushima Daiichi Nuclear Power Station accident on March 11, 2011, TEPCO was also the world's largest private power generation company.

    Due to electricity retail liberalization in April 2016, TEPCO changed to a holding company and the company name was changed: "Tokyo Electric Power Company Holdings, Inc." for electricity retailing, "TEPCO Fuel & Power Co., Ltd." for fuel and thermal power generation business, and "TEPCO Power Grid, Inc." for electricity transmission and distribution and consignment services. In the same year, TEPCO established JERA, the world's largest LNG procurement company, in partnership with Chubu Electric Power .

    TEPCO power supply configuration

    The power supply configuration of TEPCO is as follows.

    This power source composition shows the composition ratio of plans that do not specify a power source other than the plan "Aqua Energy 100" with 100% real hydroelectric power generation.

    What is the power supply configuration ? The power source composition is the breakdown of the power generation method and the source of power generation. Of course, it is important to be environmentally friendly, but it is also important to have a stable electricity supply and economic efficiency. Creating a well-balanced power generation configuration by making the best use of each feature from various power generation methods is called the best mix of power sources. Currently, utilities are not obliged to publish their power sources, but all 10 major utilities publish their power mixes. Currently there are movements to require this power configuration to be made public.

    Address of TEPCO Energy Partner

    The head office address of TEPCO Energy Partner is as follows.

    〒104-0061
    Ginza Mitsui Building, 8-13-1, Ginza, Chuo-ku, Tokyo
    TEPCO Energy Partner Co., Ltd.

    Frequently Asked Questions (TEPCO Electricity Charges)

    Below is a list of frequently asked questions about TEPCO's electricity prices.

    List of frequently asked questions (TEPCO)
    Question 1: What kind of electricity rate plan does TEPCO have?
    Answer 1

    TEPCO has an electricity rate plan that can be used in the Kanto area and an electricity rate plan that can be used in other areas (Hokkaido, Tohoku, Chubu, Hokuriku, Kansai, Chugoku, Shikoku, Kyushu).

    The electricity rate plan used by most households is the metered lamp plan.

    The standard S / L plan has almost the same charge system and amount format as the metered lamp B plan. In addition, the charges are different for each power area.

    ▷ Check the rate list of each plan

    Question 2: Does TEPCO also sell city gas?
    Answer 2

    TEPCO sells city gas in the Tokyo Gas area.

    TEPCO's "Tokutoku Gas Plan" has a lower gas rate than the general rate plan of Tokyo Gas. However, it must be used in combination with TEPCO's electricity rate plan.

    Question 3: What is TEPCO's phone number?
    Answer 3

    TEPCO accepts rate plan applications and various inquiries at the TEPCO Customer Center. The phone number is different for each region and business.

    Question 4: How to switch from TEPCO to a new power company?
    Answer 4

    1. When switching from TEPCO to a new power company at the same address

    All you have to do is make a new application to the electric power company you want to use. The new electric power company will cancel the contract with TEPCO.

    2. When switching to a new power company at another address such as moving

    You need to contact TEPCO to cancel the electricity rate plan of TEPCO at the address you are currently using. To start using electricity at your new address, you need to apply to the power company you want to use.

【関連する記事を見る】 TEPCO